top of page
Stone of Bordighera (IM)

The project involves the complete reconstruction of the road, starting with an excavation at least 25 cm deep, removing existing soil and vegetation.
The correct slopes are then studied and created to ensure adequate water drainage. After preparing the base, an electro-welded metal mesh is installed, essential for ensuring the structure's strength and stability.
The final phase consists of pouring the concrete, which creates a solid, durable surface suitable for vehicle traffic, ensuring reliability and longevity.

bottom of page


