top of page
Bordighera (IM)

The project involved removing the old tiles, fixtures, and existing pipes, followed by a thorough cleaning of the subfloor.
A specific primer was then applied to ensure maximum adhesion of the new materials.
The new tiles were installed using professional adhesive and laser leveling to achieve perfectly even surfaces.
The final step included grouting the joints with the most suitable color and removing excess material with a damp sponge, ensuring a clean, precise, and long-lasting result.

bottom of page

